1) Develop safety procedures to be employed by workers operating equipment or working in close proximity to on-going chemical reactions.
2) Determine most effective arrangement of operations, such as mixing, crushing, heat transfer, distillation, and drying.
3) Prepare estimate of production costs and production progress reports for management.
4) Direct activities of workers who operate or who are engaged in constructing and improving absorption, evaporation, or electromagnetic equipment.
5) Perform laboratory studies of steps in manufacture of new product and test proposed process in small scale operation (pilot plant).
6) Develop processes to separate components of liquids or gases or generate electrical currents, using controlled chemical processes.
7) Conduct research to develop new and improved chemical manufacturing processes.
8) Design measurement and control systems for chemical plants based on data collected in laboratory experiments and in pilot plant operations.
9) Design and plan layout of equipment.
10) Perform tests throughout stages of production to determine degree of control over variables, including temperature, density, specific gravity, and pressure.
Experience : 7-10 yrs
Email: data@mmenterprises.co.in
2) Determine most effective arrangement of operations, such as mixing, crushing, heat transfer, distillation, and drying.
3) Prepare estimate of production costs and production progress reports for management.
4) Direct activities of workers who operate or who are engaged in constructing and improving absorption, evaporation, or electromagnetic equipment.
5) Perform laboratory studies of steps in manufacture of new product and test proposed process in small scale operation (pilot plant).
6) Develop processes to separate components of liquids or gases or generate electrical currents, using controlled chemical processes.
7) Conduct research to develop new and improved chemical manufacturing processes.
8) Design measurement and control systems for chemical plants based on data collected in laboratory experiments and in pilot plant operations.
9) Design and plan layout of equipment.
10) Perform tests throughout stages of production to determine degree of control over variables, including temperature, density, specific gravity, and pressure.
Experience : 7-10 yrs
Email: data@mmenterprises.co.in
No comments:
Post a Comment
Please give your feedback or Job Request here