    Revision of Contract Documents according to Bid Documents.

    Revision of PTS and specifying Scope of Work as a main contractor.

    Review the base & Detail design submittal, schematic drawings, relay list.

    Review the earthing calculations, AC/DC Load calculations, SLD & PLD, cable sizing calculation, test format, inspection format & factory test procedure, NG Comments.

    Meeting with the designer/ supplier & NG protection department related to the material design & approval.

    Management of Sub-Contractors activities for T & C at site.

    Preparation of monthly progress report to the client.

    Participation for Meetings for work Progress for testing & Commissioning activities.

    Interaction & Implementation of the instructions issued by SEC consultant.

    Follow up Plan, Progress and co-ordination with sub-contractor to complete the activities to meet the project schedule.

    Provide full support to Ste Engineers on all field related activities.

    Following snag points, AS Built documentations, and hand offer to NG.

    Supervising the installation works for RELAY&CONTROL PANNEL Supervising the installation 

    Supervision for substation testing& commissioning and Energization .

    Follow up the Testing &Commissioning for equipment's.

    Note--Candidate's current location should be Saudi Arabia 
    • Educational Attainment: B.S in Engineering Electric Dept.
    • Years of Experience: 6 12 years.132KV S/S Protection Requirement
    • Nationality: Indian / Egyptian / Pakistan/Filipino
    • Specialization Skills: Protection work for 132kV, S/S with NG in KSA.
    • Location : K.S.A
    • Driver license
    • Fluent in English

  • Recruiter Name:Nalini Aggarwal
    Telephone:+91-120-4304605
    Reference Id:nalini.aggarwal@naukri.com

No comments:

Post a Comment

Please give your feedback or Job Request here