Thursday, 30 July 2015

Waterproofing Technician for Oman

    1. Abide by safety & Personnel Protective Equipment policies.
    2. Demonstrate Safe Work Practices and avoid unsafe behaviors.
    3. The start of the membrane application will mean that substrate conditions are acceptable for work completion. Before commencing work, all surfaces must be smooth, dry, clean and free of debris 
    4. Ensure that the Works are Carried out as Per method statement & Manufactures Recommendations
    5. Ensure the Material to be used within the Limit of Wastage .
    6. Knowledge of Sand / Grit Blasting Works for Praparing the Surface to receive waterproofing works
    7. Ability to install bitumen sheets along with Protection board either by Torch apply and or self adhesive, Pre applied or Post Applied
    8. Ability to Apply Spray / Polyurethene Waterproofing
    9. Ability to Install Geotextile membrane
    10' Dressing around Rain outlet, pipe inlets and sleeves
    11. Fixing of Aluminium Flashing profiles
    12. Sealant application of Grooves
    13. Ability to apply liquid waterproofing
    14. Report all Unsafe Conditions to your Supervisors
    15. Must be a team Player
    + years experience

MR MOHAMMED SIDDIQUEpriya@hrsolutions.net.in
aytb@hrsolutions.net.in
+91 7506253891 
+91 22 2261 2620
+91 22 22654545 

No comments:

Post a Comment

Please give your feedback or Job Request here