Thursday, 20 August 2015

Interview Schedule for Water Proofing Technician, Oman

Abide by safety & Personnel Protective Equipment policies.
Demonstrate Safe Work Practices and avoid unsafe behaviors.
The start of the membrane application will mean that substrate conditions are acceptable for work completion. Before commencing work, all surfaces must be smooth, dry, clean and free of debris 
Ensure that the Works are Carried out as Per method statement & Manufactures Recommendations
Ensure the Material to be used within the Limit of Wastage 


Knowledge of Sand / Grit Blasting Works for Praparing the Surface to receive waterproofing works
Ability to install bitumen sheets along with Protection board either by Torch apply and or self adhesive, Pre applied or Post Applied
Ability to Apply Spray / Polyurethene Waterproofing
Ability to Install Geotextile membrane


FINAL INTERVIEW ON 23RD AUG AT OUR OFFICE IN MUMBAI

2+ years experience

Recruiter Name:PRAKASH
Email Address:aeroseatravels315@gmail.com
Telephone:9699322225

1 comment:

  1. I haven’t any word to appreciate this post.....Really i am impressed from this post....the person who create this post it was a great human..thanks for shared this with us. kerdi

    ReplyDelete

Please give your feedback or Job Request here